
You are here: HOBAS World / Production
Extraction
The pipe is pulled out by a pneumatic device to approx. 200 mm, then placed on a trolley with a winch and sent for finishing.
After the pipe has been extracted, the mold is cleaned and sprayed with a special separating agent. The cover is mounted at the end of the mold and the pipe is then released for further processing.
